Competent Partner in ICT Infrastructure Build: Selected Affiliated Projects



BURKINA FASO: NSN Nokia Siemens Networks/Onatel Project 2007/8    





class-header-css3
TSS Technical Site Survey
GSM Roll-Out (TI: Rigging, Integration and Commissioning of NSN BTSs)
class-header-offline
Site Electrical Reticulations, Air-condition Installations and Integrations
Large scale Power Rack Assembly, Installation and Commissioning at sites, countrywide
class-header-connectivity
Re-Works of poor jobs
Training of local Work-force, Logistic, Project Co-ordination and Management
class-header-3d
NSN countrywide point-man in the face of NSN client (Onatel) during project duration
class-header-performance

• TSS Technical Site Survey
• GSM Roll-Out (TI: Rigging, Integration and Commissioning of NSN BTSs)
• Site Electrical Reticulations, Air-condition Installations and Integrations
• Large scale Power Rack Assembly, Installation and Commissioning at sites, countrywide
• Panels, Rectifier (Delta), Inverters, Connectors, Modules, Cablings, Fabrications, etc
• Re-Works of poor jobs

• Training of local Work-force, Logistic, Project Co-ordination and Management
• NSN countrywide point-man in the face of NSN client (Onatel) during project duration


BURKINA FASO: NSN Nokia Siemens Networks/Celtel (Zain)Project 2007





class-header-css3
class-header-offline
class-header-connectivity
(Line of Sight), Co-ordinates of existing & planned Antennas, Routes (site, E1 cabling), complete  tower and shelter design (content locations, power, grounding ), etc
class-header-3d
TSS for countrywide SDH (Synchronous Digital Hierarchy) Transmission backbone Implementation
class-header-performance
TSS for countrywide SDH (Synchronous Digital Hierarchy) Transmission backbone Implementation

  • TSS for countrywide SDH (Synchronous Digital Hierarchy) Transmission backbone Implementation

  •  (Line of Sight), Co-ordinates of existing & planned Antennas, Routes (site, E1 cabling), complete  tower and shelter design (content locations, power, grounding ), etc

  • SDH Transmission Backbone Analysis, Planning and Consulting
  •  

    Kenya: Ericsson/Telkom Kenya-Orange Project
    2008/9





    class-header-css3
    class-header-offline
    class-header-connectivity
    class-header-3d
    class-header-performance
  • Site TSS and Design
  • Site Civil and Electrical works
  • Site Re-engineering, Tower Structural Analysis and Rectifications
  • Affiliate voted “NUMBER 1/BEST” in overall Project delivery Evaluation Exercise (Jan, 09) under Primalinks leadership



  • EUROPE; Germany, Austria: O2, NSN and Vodafone Projects in 2006/7





    class-header-css3
    class-header-offline
    class-header-connectivity
    class-header-3d
    class-header-performance
  • TI;Integration and Commissioning of BTS
  • Rigging and Civil Works
  • Over 200 new Rooftop and Greenfield BTS sites constructed in Germany
  • Quality Management and Maintenance
  • Over 720 high-end BTS sites visited, maintained and managed in Austria



    • KENYA: KPA Kenya Port Authority ISS – Integrated Security System Project 2011/12





    • class-header-css3
      class-header-offline
      class-header-connectivity
      class-header-3d
      class-header-performance
    • Project planning, Costing and Engineering
    • Fortified Masonry Wall Constructions
    • Electric Fencing Installation
    • Wall Vibration Sensor Installations
    • Building of GCR Gate Control Rooms & LSC Local Security Centers
    •  Site Civil and Electrical works
    • Canopy Installations
    • Automated Gate Installations
    • Fiber Optic Cable Installations
    • CCTV Installations
    • Other Specialized civil works


    KENYA: Safaricom/Ericsson Digital City Project 2013/On-going




    • class-header-css3
      class-header-offline
      class-header-connectivity
      class-header-3d
      class-header-performance
    • Fiber Optic Civils and Integrations
    • Excavations, installation of ducts, HDPE ducts, pre-installed micro-ducts, backfilling and compaction
    • Assembly and installation of pre-manufactured Manholes
    • Microtunnelling/Thrustboring (<20m) and All Terrain [Soil, Mud, Rock] HDD Horizontal Directional Drill (>20m to 120m)
    • Pre- & Post- Testing of Fiber cables with OTDR JDSU MTS4000
    • Fiber Blowing with German Equipments (daily capacity of over 8KM cable, fully blown)
    • Splicing with Fujikura 60S

    Think outside of the box!

     

    Primalinks is leading the evolution toward 4th Generation IP networks, which will help enable the Networked Society and a world of more than 50 billion connected devices by 2020. By being smart, simple and scalable, as well as by offering superior performance, these networks will meet future demands related to mobile broadband, video traffic and the cloud.

     

     


     

    .